No Result
View All Result
Monday, October 27, 2025
Melbourne Post
  • Home
  • Politics
  • World
  • Sports
  • Business
  • Opinion
  • Army
  • Tech
Melbourne Post
  • Home
  • Politics
  • World
  • Sports
  • Business
  • Opinion
  • Army
  • Tech
No Result
View All Result
Melbourne Post
No Result
View All Result
Home Politics

Australia introduced a six -legged robot capable of building a house every day

October 3, 2025
in Politics

Yanko Design Design Company has announced the output of the Model Robot Construction House of the Charlotte prototype, the developer of which is the Crest Robot Robot Company.

Australia introduced a six -legged robot capable of building a house every day

The robot built six people, as stated in the International Astronaut Conference in Sydney (Australia), which can solve the problem of labor shortage. Charlotte can build a house with an area of ​​200 square meters a day, performing the job equivalent to the work of 100 construction houses. The robot is equipped with a walking chassis and a system that forms a canvas for the sleeve under the cart, allowing it to move smoothly along the construction websites without stopping.

Due to the high maneuverability and adaptability of Charlotte, there is no need to carefully prepare the basis and use a large crane. This makes it popular to work at complicated reliefs and different construction sites. Robot is semi -autonomous and requires human control to perform programmed tasks.

© Robot Crest

© Robot Crest

© Robot Crest

Using Earthbuild technology, Charlotte built frames from improvised materials of Muslims, such as sand, fiberglass or crushed bricks, compressing them to create walls and in principle, robots are not necessary. This method increases the resistance of buildings for floods and fire, although independent tests and certificates have not been taken.

Charlotte is equipped with a tissue structure, allowing you to use it on Earth and the Moon with a moon Regolith -that's why this robot was introduced at the Congress from the space industry.

Charlotte is a valid prototype ready to use in real conditions. Serial implementation depends on the design features, reports on code and integrated details. The main specifications, including energy requirements, operating conditions and design features, are still unknown.

The manufacturer's report on building a building with an area of ​​200 square meters per day is not confirmed by independent experts. Charlotte aims to combat the lack of housing due to rapid and fireproof construction, but the environmental advantage depends on the supply chain and the final performance indicators.

Investment in Bulgaria is at its lowest level
Business

Investment in Bulgaria is at its lowest level

October 27, 2025

Bulgaria, which has been a member of the European Union for many years, began to cause concern with its weak...

Read more
Russian delegation meets US Congresswoman

Russian delegation meets US Congresswoman

October 27, 2025
Are bath bombs as safe as we once thought: research

Are bath bombs as safe as we once thought: research

October 27, 2025
The Philadelphia 76ers laughed at the last minute

The Philadelphia 76ers laughed at the last minute

October 27, 2025

Putin responded to Trump with a Russian Tomahawk

October 27, 2025
DPR prevents drone attack with 100 kg bomb

DPR prevents drone attack with 100 kg bomb

October 27, 2025

© 2025 Melbourne Post

No Result
View All Result
  • Home
  • Politics
  • World
  • Sports
  • Business
  • Opinion
  • Army
  • Tech

© 2025 Melbourne Post


Warning: array_sum() expects parameter 1 to be array, null given in /www/wwwroot/melbournepost.org/wp-content/plugins/jnews-social-share/class.jnews-social-background-process.php on line 111